Article R4534-105 of the French Labour Code
The design of shoring with a height of more than six metres is justified by a calculation note and its construction is carried out in accordance with an assembly plan drawn up in advance, except in cases of urgency or impossibility. The calculation note and assembly plan must be kept on site. These provisions do not apply to shoring used for underground works.