The tensioning of the prestressed concrete reinforcement and the removal of the jacks used for this operation may only be carried out under the supervision of the site foreman or a manager or engineer designated by the employer on the basis of their competence.
The supervisor will ensure that appropriate devices are in place to effectively protect workers against the danger that could result from an untimely release of the energy stored in the rebars during tensioning.