When an underground shaft or gallery is to be lined with masonry or concrete, the elements of the support system are removed only as the work progresses and only insofar as, having regard to the stability of the ground through which the work is to be carried out, such removal cannot be detrimental to the safety of the workers.
Similar precautions are taken when carrying out lateral felling and backfilling work.