Each technical working group is responsible, within the limits set by the strategic steering committee, for fulfilling the tasks assigned by the latter in application of 9° of article A. 123-7.
In this capacity, it reports to the Strategic Advisory Board on the progress of its work through the submission of a report, including draft resolutions or proposals for improving the system in line with the tasks assigned.