The project management tasks are specified in section 2 for building works and in section 3 for infrastructure works.
Specific tasks are set out in section 4 when the construction methods or techniques or the industrial products to be used require the involvement of an economic operator in charge of the works or a supplier of industrial products from the time the preliminary design studies are drawn up.
The elements of the project management assignment relating to works carried out for research, testing or experimentation purposes are specified in section 5.