The preliminary design or the project serve as the basis for the competitive tendering of the economic operators responsible for the works by the project owner.
When the project owner selects a tender that includes a variant, the project manager must complete the project studies to ensure consistency, in particular by drawing up a summary of the plans and specifications and, where applicable, taking into account the provisions arising from an amended building permit.