The presentation report also includes, where applicable, the following information:
1° The reasons for having recourse to a contract awarded without prior advertising or competitive tendering, to the procedure with negotiation or to the competitive dialogue ;
2° The reasons why the contracting authority has not allocated the contract, if it has not indicated them in the consultation documents;
3° The reasons why a minimum annual turnover in excess of the ceiling set in articles R. 2142-6 to R. 2142-12 has been required, if these have not been indicated in the consultation documents;
4° The reasons why the contracting authority has requested the use of means of communication other than electronic means for the transmission of tenders;
5° A description of the appropriate measures taken by the contracting authority to ensure that competition has not been distorted by prior studies and exchanges with economic operators or by the participation of an economic operator in the preparation of the contract pursuant to Articles R. 2111-1 and R. 2111-2;
6° Any conflicts of interest identified and the measures taken as a result;
7° The reasons why the contracting authority has decided not to award a contract or not to set up a dynamic purchasing system.