The draft rules of the inter-company college are drawn up by the coordinator during the design, study and development phase of the project.
They are attached to the documents in the consultation file sent by the project owner to the contractors and, in the absence of consultation, to each contract concluded for an operation covered by the provisions of article R. 4532-77.
In the event of subcontracting, the main contractor must send each of its subcontractors the rules of the college, or draft rules if the rules have not yet been adopted when the subcontract is concluded.