The duties performed by the project manager provided for in article R. 342-4 include at least :
a) Checking that the conveyor has been installed correctly;
b) Checking that its safety systems are working properly and that, taking into account the technical and safety rules taken into account for its design and construction, it is compatible with the conditions foreseen for its operation;
c) Drawing up a report;
d) Issue of a certificate showing that the conveyor belt complies with the technical and safety regulations set out in Article R. 342-3.
The list of checks referred to in a and b is set by an order of the Minister for Transport.