The prior declaration is sent to the labour inspector and to the bodies mentioned in article L. 4532-1 with territorial jurisdiction over the location of the operation.
It shall be sent on the date of submission of the application for planning permission where this is required or, where it is not required, at least thirty days before the actual start of the work.