When, for a building or civil engineering operation involving several companies and not belonging to the first or second category, it is planned to carry out work presenting particular risks included on the list set by the order provided for in article L. 4532-8, the coordinator draws up a simplified general health and safety coordination plan in writing before the companies are consulted.
This plan takes into account the measures required to prevent risks arising from the interference of this work with the other activities of the various parties involved on the site, or from the succession of their activities when a particular risk listed in the same list remains after completion of the work.