In order to ensure that the coordinator has the authority and resources needed to carry out his duties properly, the project owner shall, from the preliminary design stage, provide for cooperation between the various parties involved in the construction process and the coordinator.
The practical details of this cooperation are set out in a document attached to the contracts signed with the various parties involved.