Article R2333-105 of the French General Code of Local Authorities
I. – The fee payable each year to a municipality for the occupation of the municipal public domain by the works of the public electricity transmission and distribution networks is set by the municipal council within the following ceilings: PR = 153 euros for municipalities with a population less than or equal to 2,000; PR = (0.183 P – 213) euros for municipalities with a population greater than 2,000 and…