Article R2431-31 of the French Public procurement code
The provisions of articles R. 2431-16 to R. 2431-18 apply to infrastructure works.
The provisions of articles R. 2431-16 to R. 2431-18 apply to infrastructure works.
When the construction methods or techniques or the industrial products to be used mean that the economic operator responsible for the works or the supplier of industrial products must be involved from the time the preliminary designs are drawn up, the contracting authority may decide to consult them in advance for one or more public contracts involving special technical requirements.This consultation takes place either at the end of the preliminary…
The pre-project and project elements for the public contracts concerned are replaced or supplemented as necessary by the specific elements mentioned in articles R. 2431-34 and R. 2431-35.
The purpose of specific pre-project studies is :1° To assess the consequences of the technical solution studied by the economic operator responsible for the works or the supplier of industrial products, ensuring that it is compatible with the constraints of the programme and that it is accompanied by all the necessary justifications and technical opinions;2° To adopt the technical solution, if necessary to have it adapted, or to propose that…
The purpose of the specific project studies is:1° To define in detail the architectural and technical requirements based on the studies of the economic operator responsible for the works or the supplier of industrial products;2° To enable the project owner to assess the operating and maintenance costs;3° To specify the period of performance of the public contracts concerned.
When, as part of a research programme receiving public financial aid, works are carried out for the purposes of research, testing or experimentation, all the provisions of this chapter apply, with the exception of articles R. 2431-4 to R. 2431-7 relating to the basic assignment for building works. The content of each of the elements of the assignment described in this chapter may be adapted to suit the specific purpose…
A joint order of the ministers responsible for infrastructure and industry, appended to this code, specifies the technical procedures for carrying out the elements of the project management assignment.
The project owner decides, at the latest before the start of the project studies, whether or not to allocate the project and specifies the impact on the project management contract.
The public works contract specifies the procedures for determining the estimated cost of the works, together with a tolerance threshold, to which the project manager is committed, and the consequences for the project manager of the commitments made.
Where the assignment entrusted to the project manager includes assisting the project owner with the award of public works contracts, the public works contract must include an undertaking by the contractor to comply with the estimated cost of the works, as determined at the latest before the launch of the procedure for awarding public works contracts. Compliance with this undertaking is checked after the economic operators responsible for the works…
Our French business lawyers are here to help.
We offer a FREE evaluation of your case.
Call us at +33 (0) 1 84 88 31 00 or send us an email.
is a Registered Trademark of
PETROFF LAW FIRM (SELARL LEGASTRAT)
182, rue de Rivoli
75001, Paris France
RCS Paris n°814433470
Paris Bar Registration n° (Toque) C2396
is a Registered Trademark of
PETROFF LAW FIRM (SELARL LEGASTRAT)
182, rue de Rivoli
75001, Paris France
RCS Paris n°814433470
Paris Bar Registration n° (Toque) C2396
Resources
is a Registered Trademark of
PETROFF LAW FIRM (SELARL LEGASTRAT)
182, rue de Rivoli
75001, Paris France
RCS Paris n°814433470
Paris Bar Registration n° (Toque) C2396
Useful links
Our French business lawyers are here to help.
We offer a FREE evaluation of your case.
Call +33 (0) 1 84 88 31 00 or send us an email.
All information exchanged through this website will be communicated to lawyers registered with a French Bar and will remain confidential.