Article R4534-41 of the French Labour Code
The walls of shafts and underground galleries, the roofs of the latter, as well as any consolidation work carried out or support systems put in place, are examined: 1° Upon resumption of each work shift, over the entire height of the shafts and over the entire length of the galleries; 2° After each blast, over a length of at least 50 metres behind the blast face. These examinations are carried…